With wafer residency time constraint of cluster tools in semiconductor manufacturing, activity time variation can make an originally feasible schedule infeasible. Thus, it is difficult to schedule them and schedulability is a vitally important issue. With bounded activity time variation considered, this paper addresses their real-time scheduling issues and conducts their schedulability analysis…