Because of residency time constraints and activity time variation of cluster tools, it is very difficult to operate such integrated semiconductor manufacturing equipment. This paper addresses their real-time operational issues. To characterize their schedulability and achieve the minimum cycle time at their steady-state operation, Petri net (PN) models are developed to describe them, which are …